Client: Jiangsu Provincial Communications Construction Bureau
Location: Nanjing, Yangzhou
Area : The route is approximately 5 km long, with the main bridge being a steel box girder suspension bridge with a main span of 1,560 meters
Service to Scope: Raw Material Testing, Welding Seam Quality Inspection, Coating Quality Inspection
The project construction is of great significance in responding to the Yangtze River Economic Belt development strategy, promoting the Yangtze River City Group and Ning-Zhen-Yang integrated development, enhancing Nanjing's primacy, accelerating the establishment of a comprehensive three-dimensional transportation system, optimizing the layout of river-crossing passages, and improving the expressway network.
The project faces multiple challenges, including steel usage reaching 80,000 tons, a long construction cycle, high quality requirements, and high construction difficulty.
The project established a steel structure testing center, where the team ensures testing quality through standardized processes and advanced technology, effectively manages construction safety risks, improves overall project quality, and promotes it as a high-quality demonstration project.